Construction Scheduling Using Primavera and MS Project
Master construction scheduling in 5 days with Primavera and MS Project. Boost your project management skills and deliver successful projects.
-
Course Outline
Introduction
This comprehensive course is designed to equip professionals with practical skills in construction scheduling using Primavera P6 and MS Project, two of the industry’s leading project management tools.
Objectives
- Understand the fundamentals of construction scheduling and project controls.
- Develop and manage schedules using Primavera P6 and MS Project.
- Analyze critical paths and resource allocation for optimized project delivery.
- Monitor progress, update schedules, and report project performance.
- Apply best practices and troubleshooting strategies in real-world scheduling scenarios.
Course Outlines
Day 1: Introduction to Construction Scheduling Concepts
- Overview of construction project management and scheduling importance
- Key terminology and scheduling methodologies
- Critical Path Method (CPM) fundamentals
- Work Breakdown Structure (WBS) concepts
- Introduction to Primavera P6 and MS Project interfaces
Day 2: Getting Started with Primavera P6
- Setting up projects and calendars in Primavera P6
- Creating WBS and activity lists
- Defining relationships and constraints
- Assigning resources and costs
- Generating baseline schedules
Day 3: Mastering MS Project for Construction Scheduling
- Setting up projects and calendars in MS Project
- Building tasks, milestones, and dependencies
- Resource allocation and leveling
- Cost tracking and budget management
- Creating and saving baselines
Day 4: Progress Monitoring and Schedule Updating
- Tracking project progress in Primavera P6 and MS Project
- Updating activities and analyzing variances
- Critical path and float analysis
- Reporting tools and dashboards
- Handling schedule delays and changes
Day 5: Advanced Techniques and Best Practices
- Comparative analysis of Primavera P6 and MS Project features
- Tips for troubleshooting scheduling issues
- Integrating schedules with cost and resource management
- Real-world case studies and lessons learned
- Final assessment and course wrap-up
This intensive five-day course delivers hands-on training in construction scheduling, focusing on both Primavera P6 and MS Project. Participants will gain essential knowledge and practical experience for planning, managing, and controlling construction project timelines.
Through real-world scenarios, interactive exercises, and expert guidance, attendees will develop the skills needed to produce effective schedules, monitor progress, and ensure successful project delivery using industry-standard tools.
| City | Location | Start | End | Duration | Price | |
|---|---|---|---|---|---|---|
| Kuala Lumpur , Malaysia | Hilton Kuala Lumpur | 2026-06-21 | 2026-06-25 | 5 days |
4,995.00 GBP
|
|
| Istanbul , Turkey | Hilton Istanbul | 2026-06-21 | 2026-06-25 | 5 days |
5,250.00 GBP
|
|
| Dubai , UAE | Address Hotel | 2026-06-21 | 2026-06-25 | 5 days |
5,750.00 GBP
|
|
| Kuala Lumpur , Malaysia | Hilton Kuala Lumpur | 2026-07-12 | 2026-07-16 | 5 days |
4,995.00 GBP
|
|
| Istanbul , Turkey | Hilton Istanbul | 2026-07-12 | 2026-07-16 | 5 days |
5,250.00 GBP
|
|
| Dubai , UAE | Address Hotel | 2026-07-12 | 2026-07-16 | 5 days |
5,750.00 GBP
|
|
| London , UK | Hilton London Paddington | 2026-07-13 | 2026-07-17 | 5 days |
6,500.00 GBP
|
|
| Kuala Lumpur , Malaysia | Hilton Kuala Lumpur | 2026-07-19 | 2026-07-23 | 5 days |
4,995.00 GBP
|
|
| Istanbul , Turkey | Hilton Istanbul | 2026-07-19 | 2026-07-23 | 5 days |
5,250.00 GBP
|
|
| Dubai , UAE | Address Hotel | 2026-07-19 | 2026-07-23 | 5 days |
5,750.00 GBP
|
|
| London , UK | Hilton London Paddington | 2026-07-20 | 2026-07-24 | 5 days |
6,500.00 GBP
|
|
| Kuala Lumpur , Malaysia | Hilton Kuala Lumpur | 2026-08-09 | 2026-08-13 | 5 days |
4,995.00 GBP
|
|
| Istanbul , Turkey | Hilton Istanbul | 2026-08-09 | 2026-08-13 | 5 days |
5,250.00 GBP
|
|
| Dubai , UAE | Address Hotel | 2026-08-09 | 2026-08-13 | 5 days |
5,750.00 GBP
|
|
| London , UK | Hilton London Paddington | 2026-08-10 | 2026-08-14 | 5 days |
6,500.00 GBP
|
|
| Kuala Lumpur , Malaysia | Hilton Kuala Lumpur | 2026-08-16 | 2026-08-20 | 5 days |
4,995.00 GBP
|
|
| Istanbul , Turkey | Hilton Istanbul | 2026-08-16 | 2026-08-20 | 5 days |
5,250.00 GBP
|
|
| Dubai , UAE | Address Hotel | 2026-08-16 | 2026-08-20 | 5 days |
5,750.00 GBP
|
|
| London , UK | Hilton London Paddington | 2026-08-17 | 2026-08-21 | 5 days |
6,500.00 GBP
|
|
| Kuala Lumpur , Malaysia | Hilton Kuala Lumpur | 2026-09-13 | 2026-09-17 | 5 days |
4,995.00 GBP
|
|
| Istanbul , Turkey | Hilton Istanbul | 2026-09-13 | 2026-09-17 | 5 days |
5,250.00 GBP
|
|
| Dubai , UAE | Address Hotel | 2026-09-13 | 2026-09-17 | 5 days |
5,750.00 GBP
|
|
| London , UK | Hilton London Paddington | 2026-09-14 | 2026-09-18 | 5 days |
6,500.00 GBP
|
|
| Kuala Lumpur , Malaysia | Hilton Kuala Lumpur | 2026-09-20 | 2026-09-24 | 5 days |
4,995.00 GBP
|
|
| Istanbul , Turkey | Hilton Istanbul | 2026-09-20 | 2026-09-24 | 5 days |
5,250.00 GBP
|
|
| Dubai , UAE | Address Hotel | 2026-09-20 | 2026-09-24 | 5 days |
5,750.00 GBP
|
|
| London , UK | Hilton London Paddington | 2026-09-21 | 2026-09-25 | 5 days |
6,500.00 GBP
|
|
| Kuala Lumpur , Malaysia | Hilton Kuala Lumpur | 2026-10-11 | 2026-10-15 | 5 days |
4,995.00 GBP
|
|
| Istanbul , Turkey | Hilton Istanbul | 2026-10-11 | 2026-10-15 | 5 days |
5,250.00 GBP
|
|
| Dubai , UAE | Address Hotel | 2026-10-11 | 2026-10-15 | 5 days |
5,750.00 GBP
|
|
| London , UK | Hilton London Paddington | 2026-10-12 | 2026-10-16 | 5 days |
6,500.00 GBP
|
|
| Kuala Lumpur , Malaysia | Hilton Kuala Lumpur | 2026-10-18 | 2026-10-22 | 5 days |
4,995.00 GBP
|
|
| Istanbul , Turkey | Hilton Istanbul | 2026-10-18 | 2026-10-22 | 5 days |
5,250.00 GBP
|
|
| Dubai , UAE | Address Hotel | 2026-10-18 | 2026-10-22 | 5 days |
5,750.00 GBP
|
|
| London , UK | Hilton London Paddington | 2026-10-19 | 2026-10-23 | 5 days |
6,500.00 GBP
|
|
| Kuala Lumpur , Malaysia | Hilton Kuala Lumpur | 2026-11-08 | 2026-11-12 | 5 days |
4,995.00 GBP
|
|
| Istanbul , Turkey | Hilton Istanbul | 2026-11-08 | 2026-11-12 | 5 days |
5,250.00 GBP
|
|
| Dubai , UAE | Address Hotel | 2026-11-08 | 2026-11-12 | 5 days |
5,750.00 GBP
|
|
| London , UK | Hilton London Paddington | 2026-11-09 | 2026-11-13 | 5 days |
6,500.00 GBP
|
|
| Kuala Lumpur , Malaysia | Hilton Kuala Lumpur | 2026-11-15 | 2026-11-19 | 5 days |
4,995.00 GBP
|
|
| Istanbul , Turkey | Hilton Istanbul | 2026-11-15 | 2026-11-19 | 5 days |
5,250.00 GBP
|
|
| Dubai , UAE | Address Hotel | 2026-11-15 | 2026-11-19 | 5 days |
5,750.00 GBP
|
|
| London , UK | Hilton London Paddington | 2026-11-16 | 2026-11-20 | 5 days |
6,500.00 GBP
|
|
| Kuala Lumpur , Malaysia | Hilton Kuala Lumpur | 2026-12-13 | 2026-12-17 | 5 days |
4,995.00 GBP
|
|
| Istanbul , Turkey | Hilton Istanbul | 2026-12-13 | 2026-12-17 | 5 days |
5,250.00 GBP
|
|
| Dubai , UAE | Address Hotel | 2026-12-13 | 2026-12-17 | 5 days |
5,750.00 GBP
|
|
| London , UK | Hilton London Paddington | 2026-12-14 | 2026-12-18 | 5 days |
6,500.00 GBP
|
|
| Kuala Lumpur , Malaysia | Hilton Kuala Lumpur | 2026-12-20 | 2026-12-24 | 5 days |
4,995.00 GBP
|
|
| Istanbul , Turkey | Hilton Istanbul | 2026-12-20 | 2026-12-24 | 5 days |
5,250.00 GBP
|
|
| Dubai , UAE | Address Hotel | 2026-12-20 | 2026-12-24 | 5 days |
5,750.00 GBP
|
|
| London , UK | Hilton London Paddington | 2026-12-21 | 2026-12-25 | 5 days |
6,500.00 GBP
|
|
| Kuala Lumpur , Malaysia | Hilton Kuala Lumpur | 2027-01-10 | 2027-01-14 | 5 days |
4,995.00 GBP
|
|
| Istanbul , Turkey | Hilton Istanbul | 2027-01-10 | 2027-01-14 | 5 days |
5,250.00 GBP
|
|
| Dubai , UAE | Address Hotel | 2027-01-10 | 2027-01-14 | 5 days |
5,750.00 GBP
|
|
| London , UK | Hilton London Paddington | 2027-01-11 | 2027-01-15 | 5 days |
6,500.00 GBP
|
|
| Kuala Lumpur , Malaysia | Hilton Kuala Lumpur | 2027-01-17 | 2027-01-21 | 5 days |
4,995.00 GBP
|
|
| Istanbul , Turkey | Hilton Istanbul | 2027-01-17 | 2027-01-21 | 5 days |
5,250.00 GBP
|
|
| Dubai , UAE | Address Hotel | 2027-01-17 | 2027-01-21 | 5 days |
5,750.00 GBP
|
|
| London , UK | Hilton London Paddington | 2027-01-18 | 2027-01-22 | 5 days |
6,500.00 GBP
|
|
| London , UK | Hilton London Paddington | 2027-02-08 | 2027-02-12 | 5 days |
6,500.00 GBP
|
|
| Kuala Lumpur , Malaysia | Hilton Kuala Lumpur | 2027-02-14 | 2027-02-18 | 5 days |
4,995.00 GBP
|
|
| Istanbul , Turkey | Hilton Istanbul | 2027-02-14 | 2027-02-18 | 5 days |
5,250.00 GBP
|
|
| Dubai , UAE | Address Hotel | 2027-02-14 | 2027-02-18 | 5 days |
5,750.00 GBP
|
|
| London , UK | Hilton London Paddington | 2027-02-15 | 2027-02-19 | 5 days |
6,500.00 GBP
|
|
| Kuala Lumpur , Malaysia | Hilton Kuala Lumpur | 2027-02-21 | 2027-02-25 | 5 days |
4,995.00 GBP
|
|
| Istanbul , Turkey | Hilton Istanbul | 2027-02-21 | 2027-02-25 | 5 days |
5,250.00 GBP
|
|
| Dubai , UAE | Address Hotel | 2027-02-21 | 2027-02-25 | 5 days |
5,750.00 GBP
|
|
| London , UK | Hilton London Paddington | 2027-03-08 | 2027-03-12 | 5 days |
6,500.00 GBP
|
|
| Kuala Lumpur , Malaysia | Hilton Kuala Lumpur | 2027-03-14 | 2027-03-18 | 5 days |
4,995.00 GBP
|
|
| Istanbul , Turkey | Hilton Istanbul | 2027-03-14 | 2027-03-18 | 5 days |
5,250.00 GBP
|
|
| Dubai , UAE | Address Hotel | 2027-03-14 | 2027-03-18 | 5 days |
5,750.00 GBP
|
|
| London , UK | Hilton London Paddington | 2027-03-15 | 2027-03-19 | 5 days |
6,500.00 GBP
|
|
| Kuala Lumpur , Malaysia | Hilton Kuala Lumpur | 2027-03-21 | 2027-03-25 | 5 days |
4,995.00 GBP
|
|
| Istanbul , Turkey | Hilton Istanbul | 2027-03-21 | 2027-03-25 | 5 days |
5,250.00 GBP
|
|
| Dubai , UAE | Address Hotel | 2027-03-21 | 2027-03-25 | 5 days |
5,750.00 GBP
|
|
| Kuala Lumpur , Malaysia | Hilton Kuala Lumpur | 2027-04-11 | 2027-04-15 | 5 days |
4,995.00 GBP
|
|
| Istanbul , Turkey | Hilton Istanbul | 2027-04-11 | 2027-04-15 | 5 days |
5,250.00 GBP
|
|
| Dubai , UAE | Address Hotel | 2027-04-11 | 2027-04-15 | 5 days |
5,750.00 GBP
|
|
| London , UK | Hilton London Paddington | 2027-04-12 | 2027-04-16 | 5 days |
6,500.00 GBP
|
|
| Kuala Lumpur , Malaysia | Hilton Kuala Lumpur | 2027-04-18 | 2027-04-22 | 5 days |
4,995.00 GBP
|
|
| Istanbul , Turkey | Hilton Istanbul | 2027-04-18 | 2027-04-22 | 5 days |
5,250.00 GBP
|
|
| Dubai , UAE | Address Hotel | 2027-04-18 | 2027-04-22 | 5 days |
5,750.00 GBP
|
|
| London , UK | Hilton London Paddington | 2027-04-19 | 2027-04-23 | 5 days |
6,500.00 GBP
|
|
| Kuala Lumpur , Malaysia | Hilton Kuala Lumpur | 2027-05-09 | 2027-05-13 | 5 days |
4,995.00 GBP
|
|
| Istanbul , Turkey | Hilton Istanbul | 2027-05-09 | 2027-05-13 | 5 days |
5,250.00 GBP
|
|
| Dubai , UAE | Address Hotel | 2027-05-09 | 2027-05-13 | 5 days |
5,750.00 GBP
|
|
| London , UK | Hilton London Paddington | 2027-05-10 | 2027-05-14 | 5 days |
6,500.00 GBP
|
|
| Kuala Lumpur , Malaysia | Hilton Kuala Lumpur | 2027-05-16 | 2027-05-20 | 5 days |
4,995.00 GBP
|
|
| Istanbul , Turkey | Hilton Istanbul | 2027-05-16 | 2027-05-20 | 5 days |
5,250.00 GBP
|
|
| Dubai , UAE | Address Hotel | 2027-05-16 | 2027-05-20 | 5 days |
5,750.00 GBP
|
|
| London , UK | Hilton London Paddington | 2027-05-17 | 2027-05-21 | 5 days |
6,500.00 GBP
|
|
| Kuala Lumpur , Malaysia | Hilton Kuala Lumpur | 2027-06-13 | 2027-06-17 | 5 days |
4,995.00 GBP
|
|
| Istanbul , Turkey | Hilton Istanbul | 2027-06-13 | 2027-06-17 | 5 days |
5,250.00 GBP
|
|
| Dubai , UAE | Address Hotel | 2027-06-13 | 2027-06-17 | 5 days |
5,750.00 GBP
|
|
| London , UK | Hilton London Paddington | 2027-06-14 | 2027-06-18 | 5 days |
6,500.00 GBP
|
|
| Course code | CEG14 |
|---|---|
| Delivery mode | onsite |
| Duration | 5 days |
| Updated | 2026-02-12 17:54:28 |
What’s included
- Code: CEG14
- Duration: 5 days
- Delivery: Onsite
- Outline: Available
Related courses
Construction Engineering Best Practices
Construction Engineering Management
Construction Delay Analysis and TIA